• <wbr id="u9jjf"><legend id="u9jjf"></legend></wbr>
      1. <wbr id="u9jjf"></wbr>

            <sub id="u9jjf"><code id="u9jjf"></code></sub>
            Home  >  Project Reference

            2021-Battery-New energy

            Updatetime:2022-02-02 09:18:00

            In 2021, HIGHER successfully delivered the Coating and Calender-Slitter process control system for German BMW Parsdorf new energy factory.

            In this project, the BMW standard of TMO-V3 is required for the first time, and we delivered with the "Over-sea" mode of domestic design and foreign engineering.

            This project uses HIMATIC-DES design platform, and completes the automatic design of software, hardware and HMI applied to Siemens system through TCT system, and artificial intelligence technology input, which greatly reduces design risks and improves project implementation efficiency.

            The TMO requirements proposed by BMW are fully delivered and approved by the user's satisfaction

            \
            欧美丰满妇大ass,国产精产视频在线观看,女人与公拘交的视频网站,黃色毛片一女和三男